Plaimae Corporation|Hampolt Corporation

Plaimae Corporation|Hampolt Corporation

  • Home
  • About us
  • Product
    • Pushwheel Switches
      • PF 21
      • PF 31
      • PF 43
      • PF 44
      • PF 46
      • PF 49
      • PF 52
      • PF 52 - PP
      • PR 52
      • PF 54
      • PF 54 - PP
      • PF 62
    • Thumbwheel Switches
      • TF 31
      • TF 41
      • TF 51
      • TR 51
      • GTF511271-09RN2C
      • GTF511271-EVM01
    • Rotary DIP Switches
      • DRS300 Standard Series
      • DRR300 Right Angle Series
      • DRI300 Right Angle Series in pitch 2.54mm are available
      • DRS400 Standard Series
      • 3 x 3 Standard Series of Rotary DIP Switches
      • 3 x 3 Right Angle Series of Rotary DIP Switches
      • 4 x 1 Standard Series of Rotary DIP Switches
      • 4 x 1 Right Angle Series of Rotary DIP Switches
      • Miniature Series of Rotary DIP Switches
      • Tape & Reel Packaging of Rotary DIP Switches
    • Wire Harness
      • PL 01
      • PL 02
      • PL 03
      • PL 04
      • PL 05
      • PL 06
    • Codes
      • Code Available
      • CODE No: 10
      • CODE No: 11
      • CODE No: 12
      • CODE No: 13
      • CODE No: 14
      • CODE No: 22
      • CODE No: 31
      • CODE No: 33
      • CODE No: 51
      • CODE No: 52
      • CODE No: 53
      • CODE No: 71
    • Terminals
      • No. 1
      • No. 2
      • No. 3
      • No. 4
      • No. 5
      • No. 6
      • No. 7
      • No. 8
      • No. 9
      • No. P
      • Dimensions of Pins
    • Colors
    • Connectors
    • Spacers
    • End Caps
    • Specifications
      • Thumbwheel Switches
      • Rotary DIP Switches
  • How to order
  • Contact us
GTF511271-EVM01
Back to Product
 
GTF511271-EVM01.jpg
GTF511271-EVM012.jpg
 
 
 
普萊買企業有限公司_logo
 
 
 
No.10, Lane 66, ChungShan 1 Rd., Pate District, Taoyuan City, Taiwan.
Copyright © Plaimae Corporation All rights reserved.
 
 
  • Home
  • About us
  • Product
    • Pushwheel Switches
    • Thumbwheel Switches
    • Rotary DIP Switches
    • Wire Harness
    • Codes
    • Terminals
    • Colors
    • Connectors
    • Spacers
    • End Caps
    • Specifications
  • How to order
  • Contact us
© 2026, All Rights Reserved.
TOP